Skip to main content

Confluence Hall

The Engineering Department is housed in the Confluence Hall building. It was opened on January, 2018. Information about this building is listed below.

  • 68,700 square feet - total
    • 54,700 square feet – mechanical and civil engineering programs
    • 14,000 square feet – Eureka! McConnell Science Museum
  • $26.4 million - funded by CMU with $5.5 million from Eureka!
  • 22 classrooms/labs/shops
    • Includes classroom/lab hybrid rooms; computer labs; project labs; specialty labs; and machining, welding and wood shops
  • Room for student club projects
  • 15-foot wind tunnel
  • Labs and shops filled with leading edge equipment and tools including a hydraulic ironworker, CNC plasma table, tensile machine, optical comparator and much more
  • Green Globes certified for sustainable and energy efficient construction
  • Connected to the campus geo-thermal exchange system
  • General contractor – Shaw Construction
  • Bennett Wagner Grody Architects
Confluence Hall
Confluence Hall
     
Classroom
Classroom
   
Manufacturing Laboratory
Manufacturing Laboratory
  
Senior Design Laboratory
Materials Science Laboratory
  
Electronics Laboratory
Electronics Laboratory
  
Student Lounge
Student Lounge